Para limpiar una bomba instalada, siga el procedimiento de apagado de la bomba:

Feb 24, 2022|

Para limpiar una bomba instalada, siga el procedimiento de apagado de la bomba:

 

1. Remove all water cooling lines and cut off the primary circuit power supply to the pump heater. 2. Release all pump oil. 3. Unscrew the inlet and front pipe connection bolts and remove the pump from the system. 4. Remove the water cooling cap (if applicable). 5. Remove the nozzle assembly in accordance with the method described in the operation manual of the specific pump model. 6. Carefully clean the inside of the pump body with acetone and flush with isopropyl alcohol. The pump is then blown dry with clean, dry, oil-free compressed air. 7. Carefully clean nozzle assembly with acetone. Wipe all surfaces with isopropyl alcohol and blow dry them with clean, dry, oil-free compressed air. 8. Reinstall the nozzle and water cooling cap to the pump body. Make sure the nozzle is properly aligned with the front stage system (if applicable). 9. Check the condition of o-rings. Replace o-rings that show any signs of aging or compression. 10. Connect the pump to the system.

Advertencia:
No lo use cerca de una fuente de-temperatura alta. Ventile el área de trabajo con un ventilador y use una bomba de difusión en una habitación grande bien-ventilada. Si es necesario, también se puede utilizar un aparato de respiración separado.
Asegúrese siempre de que las operaciones de limpieza se lleven a cabo en una habitación amplia y bien-ventilada. Utilice gafas, guantes y ropa protectora.

motocycle parts coating

Empresa IKS PVD, máquina de revestimiento decorativo, máquina de revestimiento de herramientas, máquina de revestimiento DLC, máquina de revestimiento óptico, línea de revestimiento al vacío PVD, el proyecto llave en mano- está disponible. Contáctenos ahora, E-correo electrónico:iks.pvd@foxmail.com


Envíeconsulta